What we test, and to what criterion

Testing & Inspection

Every pressure assembly is hydrostatically tested at 1.5 times working pressure. Everything else is available — if you ask at enquiry.

Every pressure-retaining assembly we despatch has been tested. This page states what we test, to what criterion, and what documentation you receive — so it can be checked against a project specification before an order is placed.

Standard on every pressure assembly

TestCriterion
Hydrostatic pressure test1.5 × working pressure, held; no leakage, no permanent deformation
Visual and dimensional inspectionAgainst the approved assembly drawing
Weld visual inspectionFull circumference, both ends
Material traceabilityEvery pressure-retaining component traced to its mill test certificate

On request — in our own works

TestWhat it establishes
Pneumatic / air-under-water testLeak tightness where hydrostatic testing is not acceptable
Positive material identificationConfirms the alloy of the finished assembly, not just the incoming material
Cycle / fatigue testingMovement capability against a stated number of cycles
Burst testingDestructive verification of the safety factor on a sample

On request — subcontracted to a qualified third party

We do not pretend these are ours. They are placed with a specialist, the report comes back in your documentation pack, and the sub-supplier is named at enquiry if you ask.

Process or testWhat it establishes
Helium mass-spectrometry leak detectionVery low leak rates, for vacuum and critical containment duty
Radiographic examination (RT)Sub-surface weld integrity
Ultrasonic examination (UT)Sub-surface and thickness verification
Dye penetrant examination (PT)Surface-breaking defects in welds
ElectropolishingLower surface roughness and a passivated bore, for high-purity and hygienic duty
Orbital weldingRepeatable, crevice-free autogenous welds where a client specification calls for it
Oxygen cleaningCleanliness to the stated oxygen-service standard, with the certificate
Placed with a qualified subcontractor, planned into the order, and certified back to you.
Hydrostatic and helium leak testing, in outline.
Fig. 1 Hydrostatic and helium leak testing, in outline.

Third-party inspection

We work routinely with third-party inspection agencies and welcome witnessed testing. Nominate the agency and the hold points at enquiry so the inspection is planned into the production sequence rather than interrupting it. Our ISO certification is held with TÜV Rheinland; witnessed inspection by another agency is arranged to your nomination.

Documentation

DocumentIssued
Test certificateWith every pressure-retaining assembly
EN 10204 3.1 material certificateOn request — specify at enquiry
EN 10204 3.2 certificateWhere an independent inspector or your representative validates
Dimensional reportOn request
Welder and procedure qualification recordsOn request
Manufacturing data bookFor project orders, compiled to the specification's index
Ask at enquiry, not at despatch. Every document above is straightforward when it is planned into the order. Retro-fitting documentation to a completed assembly is sometimes impossible — a 3.2 certificate cannot be created after the inspector has gone home. On export and pre-qualification work this is the single most common cause of delay.