Every pressure assembly is hydrostatically tested at 1.5 times working pressure. Everything else is available — if you ask at enquiry.
Every pressure-retaining assembly we despatch has been tested. This page states what
we test, to what criterion, and what documentation you receive — so it can be checked against a
project specification before an order is placed.
Standard on every pressure assembly
Test
Criterion
Hydrostatic pressure test
1.5 × working pressure, held; no leakage, no permanent deformation
Visual and dimensional inspection
Against the approved assembly drawing
Weld visual inspection
Full circumference, both ends
Material traceability
Every pressure-retaining component traced to its mill test certificate
On request — in our own works
Test
What it establishes
Pneumatic / air-under-water test
Leak tightness where hydrostatic testing is not acceptable
Positive material identification
Confirms the alloy of the finished assembly, not just the incoming material
Cycle / fatigue testing
Movement capability against a stated number of cycles
Burst testing
Destructive verification of the safety factor on a sample
On request — subcontracted to a qualified third party
We do not pretend these are ours. They are placed with a specialist, the report comes back in your
documentation pack, and the sub-supplier is named at enquiry if you ask.
Process or test
What it establishes
Helium mass-spectrometry leak detection
Very low leak rates, for vacuum and critical containment duty
Radiographic examination (RT)
Sub-surface weld integrity
Ultrasonic examination (UT)
Sub-surface and thickness verification
Dye penetrant examination (PT)
Surface-breaking defects in welds
Electropolishing
Lower surface roughness and a passivated bore, for high-purity and hygienic duty
Orbital welding
Repeatable, crevice-free autogenous welds where a client specification calls for it
Oxygen cleaning
Cleanliness to the stated oxygen-service standard, with the certificate
Placed with a qualified subcontractor, planned into the order, and certified back to you.
Fig. 1 Hydrostatic and helium leak testing, in outline.
Third-party inspection
We work routinely with third-party inspection agencies and welcome witnessed testing. Nominate the
agency and the hold points at enquiry so the inspection is planned into the production sequence
rather than interrupting it. Our ISO certification is held with TÜV Rheinland; witnessed inspection by another
agency is arranged to your nomination.
Documentation
Document
Issued
Test certificate
With every pressure-retaining assembly
EN 10204 3.1 material certificate
On request — specify at enquiry
EN 10204 3.2 certificate
Where an independent inspector or your representative validates
Dimensional report
On request
Welder and procedure qualification records
On request
Manufacturing data book
For project orders, compiled to the specification's index
Ask at enquiry, not at despatch. Every document above is
straightforward when it is planned into the order. Retro-fitting documentation to a completed
assembly is sometimes impossible — a 3.2 certificate cannot be created after the inspector has gone
home. On export and pre-qualification work this is the single most common cause of delay.
Tell us about the job. We will work out what it needs.
Send the medium, pressure, temperature, movement and end connections — or just describe the problem. You get back a specified assembly and a drawing, and a price once the specification is settled.