HomeApplications › Sanitary hose
Applications

Sanitary hose

The hose has to drain, it has to clean, and you have to be able to prove both. Holding pressure is the easy part of this duty.

On a food, dairy or pharmaceutical line the hose is not judged on whether it holds pressure. It is judged on whether it drains, whether it cleans, and whether you can prove both to somebody with a clipboard.

What this service does to a hose

Every corrugation is a valley, and a valley holds liquid. On a horizontal run that is a series of small reservoirs of product that the CIP cycle has to reach and clear. Get the routing wrong — a sag, a low point, a hose that rises before it falls — and the line will pass a pressure test and fail a swab.

The second mechanism is the cleaning itself. Hot caustic, nitric and peracetic acid are all harder on stainless than the product ever is, and they run at temperature. The third is steam-in-place: every SIP cycle is a thermal cycle, and a line sterilised twice a day is accumulating fatigue at the corrugation crests whether or not anyone is counting.

What we would fit

ElementWhat we would supplyWhy
Hose316L annular corrugatedMolybdenum for the chlorides in CIP water and in the product
EndsTri-clamp to ISO 2852 / DIN 32676, DIN 11851 union, or ISO 2037 tube endCrevice-free at the joint, and strippable for inspection
WeldsFull penetration, crevice-free, internally dressedA weld bead is a crevice and a crevice is a finding
LinerPTFE smooth bore where full drainability is requiredTurns the corrugated bore into a straight one
FinishTo the Ra your specification statesSurface finish is a number, not an adjective — tell us the number
A smooth-bore liner removes the valleys entirely, which is what full drainability actually means.
Fig. 1 A smooth-bore liner removes the valleys entirely, which is what full drainability actually means.

What we would not fit, and what happens

Interlock hose. The seam is open, so it is neither pressure-tight nor cleanable. It has no place inside a product line.

304L where the CIP water carries chlorides. It will pit, and it will pit under the deposits you cannot see.

A hose installed so it cannot drain. This is the most common finding and it is an installation decision, not a product one. The installation guide covers the geometries.

On documentation. Sanitary work is usually bought on the paperwork as much as the part — material certificates, surface finish records, liner traceability, weld records. Tell us what the audit expects and we will tell you exactly which of it we can supply and which we cannot. A specification we cannot meet is better refused at enquiry than discovered at inspection.

What we need to size it

We needBecause
Product, and the CIP and SIP chemistryThe cleaning cycle is usually the harder duty
SIP temperature, and cycles per dayThat is the fatigue number
Surface finish required, as an Ra figure"Sanitary finish" means different things in different plants
End connections and size standardTri-clamp, DIN and ISO are not interchangeable
How the hose is routed and whether it can fallDrainability is decided by the installation

Read next

Tell us about the job. We will work out what it needs.

Send the medium, pressure, temperature, movement and end connections — or just describe the problem. You get back a specified assembly and a drawing, and a price once the specification is settled.

Talk to an engineer  What we need to quote